Victron
Victron SmartSolar MPPT 150/45 Solar Charge Controller
Sale price $199.00 Regular price $259.00Unit priceIn stock (100 units)- 61% off
ROCKSOLAR
Weekender 80W 88Wh Portable Power Station
Sale price $69.99 Regular price $179.99Unit priceIn stock (158 units) - 58% off
ROCKSOLAR
Weekender MAX 80W 111Wh Portable Power Station
Sale price $99.99 Regular price $239.99Unit priceIn stock (178 units) - 53% off
ROCKSOLAR
Weekender MAX PRO 250W 277.5 Wh Portable Power Station
Sale price $189.99 Regular price $399.99Unit priceIn stock (185 units) - 36% off
ROCKSOLAR
Zshine 440W Bifacial Double Glass Monocrystalline PV Module ($0.42/W)
Sale price $184.80 Regular price $289.99Unit priceIn stock (216 units) - 51% off
ROCKSOLAR
Zshine 440W Bifacial Dual Glass Module ( 36 panels/pallet) (0.34$/W)
Sale price $5,385.60 Regular price $10,999.99Unit priceIn stock (200 units) - 54% off
ROCKSOLAR
Zshine 585W N-Type TOPCon Bifacial Double Glass Solar Module (0.393$/W)
Sale price $229.99 Regular price $499.99Unit priceIn stock (55 units) - 44% off
ROCKSOLAR
Zshine 585W N-Type TOPCon Bifacial Double Glass Solar Module (0.375$/W) (36 Panels/Pallet)
Sale price $7,897.50 Regular price $13,999.99Unit priceIn stock (100 units) - 59% off
ROCKSOLAR
Zshine 705W N-Type High efficiency Bifacial Dual Glass Module ($0.36/W 31 panels/pallet)
Sale price $7,867.80 Regular price $18,999.99Unit priceIn stock (95 units)
Common Question
Can a hybrid inverter work without a battery?
Most can run as an ordinary grid-tie inverter with no battery fitted, and have storage added later. You lose outage protection until the battery is installed — that is the whole reason to buy hybrid rather than grid-tie.
How much does a hybrid solar system cost?
Complete systems on this page range from roughly $9,700 to $39,600, depending on inverter size and how much storage you choose. That covers the equipment; installation, permits and racking are additional and vary by site.
Do I need an electrician?
Yes. These systems connect to your main service and involve high DC voltages. Design, installation and inspection must be carried out by a licensed electrician or professional engineer, to the National Electrical Code and any local amendments.
Will it work with my existing solar panels?
Often, if the array voltage and current fit within the hybrid inverter's limits. Send us your panel model and how they are wired, and we will check it before you order.